We are committed to building a new energy vehicle (EV) microgrid based on "intelligent & efficient green energy distribution system".
Relying on an enormous green power supply in the industrial park microgrid and the township microgrid, we have formed a three-level station architecture of EV microgrid consisting main station, secondary energy substations and tertiary mobile energy replenishment stations. The main station stores the green electricity in the "Energy Cube". The secondary energy substation meets the conventional charging requirements of public parking lots through the "Energy Cube and Fixed DCDC Charging Terminal". The tertiary mobile charging station can meet the temporary and tidal charging needs of residential areas, commercial offices, tourist attractions, emergency and rescue teams through mobile charging robots. The above-mentioned three-level stations are intelligently scheduled through the "digital comprehensive green energy service cloud platform", and the efficient operation of the entire EV microgrid is realized through AI algorithm by analyzing power generation data, energy storage data, charging station energy consumption data, price data, user data and road data.
Thanks to the EV microgrid, we have completely eliminated difficulties in the construction of traditional charging stations, such as the contract period of the site, power capacity and access distance, and lack of parking spaces.